Högskolan i Skövde

his.sePublications
Change search
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • apa-cv
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf
Toward a Sustainable Onshore Power Supply: Integrating RESs and BESS at the Port of Kapellskär Microgrid
University of Skövde, School of Engineering Science. University of Skövde, Virtual Engineering Research Environment. (Virtual Manufacturing Processes (VMP))ORCID iD: 0000-0002-7475-2657
Ports of Stockholm, Sweden.
Ports of Stockholm, Sweden.
2025 (English)In: 2025 IEEE International Conference on Environment and Electrical Engineering and 2025 IEEE Industrial and Commercial Power Systems Europe (EEEIC / I&CPS Europe) / [ed] Zbigniew Leonowicz; Erika Stracqualursi; Michal Jasinski, IEEE, 2025Conference paper, Published paper (Refereed)
Abstract [en]

This paper presents an initial study of a Battery Energy Storage System (BESS) sizing for Onshore Power Supply (OPS) at the Port of Kapellskär in Sweden. The OPS is for the Roll-on/Roll-off (Ro-Ro) ships with a focus on integrating renewable energy sources. A scenario involving grid capacity limitations is used to determine the key BESS parameters required to support OPS operations effectively.

Place, publisher, year, edition, pages
IEEE, 2025.
Series
International Conference on Environment and Electrical Engineering (EEEIC), ISSN 2994-9440, E-ISSN 2994-9467
Keywords [en]
BESS Sizing, Grid Capacity Limitation, Onshore Power Supply, Peak Shaving, PV system, Electric power transmission networks, Natural resources, Renewable energy, Battery energy storage system sizing, Battery energy storage systems, Capacity limitation, Microgrid, Peak-shaving, Power supply, System sizings, Microgrids
National Category
Energy Systems
Research subject
Virtual Manufacturing Processes (VMP)
Identifiers
URN: urn:nbn:se:his:diva-25974DOI: 10.1109/EEEIC/ICPSEurope64998.2025.11169150Scopus ID: 2-s2.0-105019051047ISBN: 979-8-3315-9515-9 (electronic)ISBN: 979-8-3315-9514-2 (electronic)ISBN: 979-8-3315-9516-6 (print)OAI: oai:DiVA.org:his-25974DiVA, id: diva2:2010208
Conference
2025 IEEE International Conference on Environment and Electrical Engineering and 2025 IEEE Industrial and Commercial Power Systems Europe (EEEIC / I&CPS Europe), 15-18 July 2025, Chania, Crete, Greece
Projects
Port Microgrid: Innovative Microgrid Design for Sustainable Onshore Power Supply: Port of Stockholm Case Study
Funder
Vinnova, 2024-03390
Note

© 2025 IEEE

This work was supported financially by VINNOVA Foundation for the “Port Microgrid” project through the Sustainable Port - System Demonstrator Call (dnr: 2024-03390).

Available from: 2025-10-30 Created: 2025-10-30 Last updated: 2026-05-22Bibliographically approved

Open Access in DiVA

No full text in DiVA

Other links

Publisher's full textScopus

Authority records

Kermani, Mostafa

Search in DiVA

By author/editor
Kermani, Mostafa
By organisation
School of Engineering ScienceVirtual Engineering Research Environment
Energy Systems

Search outside of DiVA

GoogleGoogle Scholar

doi
isbn
urn-nbn

Altmetric score

doi
isbn
urn-nbn
Total: 106 hits
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • apa-cv
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf