Högskolan i Skövde

his.sePublikationer
Ändra sökning
RefereraExporteraLänk till posten
Permanent länk

Direktlänk
Referera
Referensformat
  • apa
  • apa-cv
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Annat format
Fler format
Språk
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Annat språk
Fler språk
Utmatningsformat
  • html
  • text
  • asciidoc
  • rtf
Utvärdering och analys av batchstorlekar, produktsekvenser och omställningstider
Högskolan i Skövde, Institutionen för ingenjörsvetenskap.
Högskolan i Skövde, Institutionen för ingenjörsvetenskap.
2015 (Svenska)Självständigt arbete på grundnivå (kandidatexamen), 20 poäng / 30 hpStudentuppsats (Examensarbete)Alternativ titel
Evaluation and analysis of batch sizes, production sequences and setup times (Engelska)
Abstract [en]

Volvo GTO is one of the strongest brands in the truck industry, with a long and proud history of world-leading innovations. The factory in Skövde produces diesel engines of various sizes to Volvo GTO. The project has been carried out on the processing part of grovdel crankshaft. Where the objective was to construct a simulation model that reflects flows 0, 1 and 2 on the crankshaft grovdel order to produce the best driving style for the size of the batches and sequences, focusing on PIA, between the stock and conversion-up times. A theoretical study intervention gave knowledge to the methodology to ensure that the data is collected and processed correctly. The data were collected in an Excel document, which was integrated with the simulation model for an overview and adjustments would be possible.

The simulation program, Siemens Plant Simulation 12 used in the construction of the complex model of the three flows, which where verified and validated against the real flows. Optimization on the simulation model was made with a high and a low demand for crankshafts. Several objects were taken into consideration as: minimal waiting processing Findel, minimal setup time and minimal total-PIA from a truly viable perspective. The optimization showed a possible production planning in order to best be able to run such large batches as possible with reduced readjustment time and for delays of production in processing rawflows to not occur in the refined flow. For maximum capacity in the company there are two different optimal solutions one solution focused on reducing setup time and the second solution to minimize the number of additional production hours per week.

Discrete simulation of production flows are being used to support production planning and simulation model is created for the continued use of the Volvo GTO, either in simulation group or future researches and theses in collaboration with the University of Skövde. The project objectives were achieved with good results and resulted as a standing basis for future planning of batches and sequences of processing crankshaft Volvo GTO.

Ort, förlag, år, upplaga, sidor
2015. , s. 105
Nyckelord [en]
Processing flows, throughput per hour, simulation model, changeovers, optimization, buffer, portal, operation, input data, buffer, cycle time, sequence
Nyckelord [sv]
Bearbetning flöden, takt per timme, simuleringsmodell, omställningar, optimering, buffert, portal, operation, indata, lager, cykeltid, sekvens.
Nationell ämneskategori
Teknik och teknologier
Identifikatorer
URN: urn:nbn:se:his:diva-11859OAI: oai:DiVA.org:his-11859DiVA, id: diva2:897829
Ämne / kurs
Automatiseringsteknik
Utbildningsprogram
Högskoleingenjörsexamen, 180hp
Presentation
, Skövde
Handledare
Examinatorer
Tillgänglig från: 2016-02-03 Skapad: 2016-01-26 Senast uppdaterad: 2025-09-29Bibliografiskt granskad

Open Access i DiVA

fulltext(4284 kB)548 nedladdningar
Filinformation
Filnamn FULLTEXT01.pdfFilstorlek 4284 kBChecksumma SHA-512
6e6f1e50837f96ee1568ab161620fc3444921bf9b35631a3340fad4d0592dbe288049886c4c32179be5b79e9888e9f95aa210581a3d9203fab3d792e7a4df19f
Typ fulltextMimetyp application/pdf

Sök vidare i DiVA

Av författaren/redaktören
Lundberg, JesperMehtonen, Ronja
Av organisationen
Institutionen för ingenjörsvetenskap
Teknik och teknologier

Sök vidare utanför DiVA

GoogleGoogle Scholar
Totalt: 549 nedladdningar
Antalet nedladdningar är summan av nedladdningar för alla fulltexter. Det kan inkludera t.ex tidigare versioner som nu inte längre är tillgängliga.

urn-nbn

Altmetricpoäng

urn-nbn
Totalt: 927 träffar
RefereraExporteraLänk till posten
Permanent länk

Direktlänk
Referera
Referensformat
  • apa
  • apa-cv
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Annat format
Fler format
Språk
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Annat språk
Fler språk
Utmatningsformat
  • html
  • text
  • asciidoc
  • rtf