Öppna denna publikation i ny flik eller fönster >>2015 (Engelska)Ingår i: The International Journal of Advanced Manufacturing Technology, ISSN 0268-3768, E-ISSN 1433-3015, Vol. 77, nr 1-4, s. 705-715Artikel i tidskrift (Refereegranskat) Published
Abstract [en]
Manufacturing companies today need to maintain a high level of flexibility and adaptability to deal with uncertainties on dynamic shop floors, including e.g. cutting tool shortage, part supply interruption, urgent job insertion or delay, and machine unavailability. Such uncertainties are characteristic in component assembly operations. Addressing the problem, we propose a new method using function blocks to achieve much improved adaptability in assembly planning and robot control. In this paper, we propose to use event-driven function blocks for robotic assembly, aiming to plan trajectory and execute assembly tasks in real-time. It is envisioned that this approach will achieve better adaptability if applied to real-world applications.
Ort, förlag, år, upplaga, sidor
Springer London, 2015
Nyckelord
Adaptability, Robotic assembly, Trajectory planning, Function block
Nationell ämneskategori
Elektroteknik och elektronik
Forskningsämne
Teknik; Produktion och automatiseringsteknik
Identifikatorer
urn:nbn:se:his:diva-10466 (URN)10.1007/s00170-014-6468-1 (DOI)000350117300055 ()2-s2.0-84925461308 (Scopus ID)
Anmärkning
Published online: 22 October 2014
2014-12-192014-12-192025-09-29Bibliografiskt granskad