Högskolan i Skövde

his.sePublikasjoner
Endre søk
Begrens søket
1 - 1 of 1
RefereraExporteraLink til resultatlisten
Permanent link
Referera
Referensformat
  • apa
  • apa-cv
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Annet format
Fler format
Språk
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Annet språk
Fler språk
Utmatningsformat
  • html
  • text
  • asciidoc
  • rtf
Treff pr side
  • 5
  • 10
  • 20
  • 50
  • 100
  • 250
Sortering
  • Standard (Relevans)
  • Forfatter A-Ø
  • Forfatter Ø-A
  • Tittel A-Ø
  • Tittel Ø-A
  • Type publikasjon A-Ø
  • Type publikasjon Ø-A
  • Eldste først
  • Nyeste først
  • Skapad (Eldste først)
  • Skapad (Nyeste først)
  • Senast uppdaterad (Eldste først)
  • Senast uppdaterad (Nyeste først)
  • Disputationsdatum (tidligste først)
  • Disputationsdatum (siste først)
  • Standard (Relevans)
  • Forfatter A-Ø
  • Forfatter Ø-A
  • Tittel A-Ø
  • Tittel Ø-A
  • Type publikasjon A-Ø
  • Type publikasjon Ø-A
  • Eldste først
  • Nyeste først
  • Skapad (Eldste først)
  • Skapad (Nyeste først)
  • Senast uppdaterad (Eldste først)
  • Senast uppdaterad (Nyeste først)
  • Disputationsdatum (tidligste først)
  • Disputationsdatum (siste først)
Merk
Maxantalet träffar du kan exportera från sökgränssnittet är 250. Vid större uttag använd dig av utsökningar.
  • 1.
    Gunstedt, Andreas
    et al.
    Högskolan i Skövde, Institutionen för teknik och samhälle.
    Bergström, Samuel
    Högskolan i Skövde, Institutionen för teknik och samhälle.
    Konstruktion av pipelinebro i Charagua, Bolivia2009Independent thesis Basic level (degree of Bachelor), 20 poäng / 30 hpOppgave
    Abstract [en]

    Guazuigua is a small village in Bolivia, which has had too small water resources, especially for irrigation. A project started after some studies were made, to create a canal to provide the village with water from a nearby town. To make the canal work it had to cross a dried out river. There have been several attempts to cross these dried out rivers, but with poor results. The purpose of the report is to provide a solution for this problem. During the field studies, the project changed direction, and a decision was made to build a well system instead. This proved to be a better solution for the village’s water problem. The report still remained with solving the canal problem. Calculations show that a pipe placed across the dried out river would break down. The report suggests a support construction which resembles a cable stayed bridge, which is build economical and by materials accessible in the area.

    Fulltekst (pdf)
    FULLTEXT01
1 - 1 of 1
RefereraExporteraLink til resultatlisten
Permanent link
Referera
Referensformat
  • apa
  • apa-cv
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Annet format
Fler format
Språk
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Annet språk
Fler språk
Utmatningsformat
  • html
  • text
  • asciidoc
  • rtf