Högskolan i Skövde

his.sePublications
Change search
Refine search result
1 - 1 of 1
CiteExportLink to result list
Permanent link
Cite
Citation style
  • apa
  • apa-cv
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf
Rows per page
  • 5
  • 10
  • 20
  • 50
  • 100
  • 250
Sort
  • Standard (Relevance)
  • Author A-Ö
  • Author Ö-A
  • Title A-Ö
  • Title Ö-A
  • Publication type A-Ö
  • Publication type Ö-A
  • Issued (Oldest first)
  • Issued (Newest first)
  • Created (Oldest first)
  • Created (Newest first)
  • Last updated (Oldest first)
  • Last updated (Newest first)
  • Disputation date (earliest first)
  • Disputation date (latest first)
  • Standard (Relevance)
  • Author A-Ö
  • Author Ö-A
  • Title A-Ö
  • Title Ö-A
  • Publication type A-Ö
  • Publication type Ö-A
  • Issued (Oldest first)
  • Issued (Newest first)
  • Created (Oldest first)
  • Created (Newest first)
  • Last updated (Oldest first)
  • Last updated (Newest first)
  • Disputation date (earliest first)
  • Disputation date (latest first)
Select
The maximal number of hits you can export is 250. When you want to export more records please use the Create feeds function.
  • 1.
    Gunstedt, Andreas
    et al.
    University of Skövde, School of Technology and Society.
    Bergström, Samuel
    University of Skövde, School of Technology and Society.
    Konstruktion av pipelinebro i Charagua, Bolivia2009Independent thesis Basic level (degree of Bachelor), 20 credits / 30 HE creditsStudent thesis
    Abstract [en]

    Guazuigua is a small village in Bolivia, which has had too small water resources, especially for irrigation. A project started after some studies were made, to create a canal to provide the village with water from a nearby town. To make the canal work it had to cross a dried out river. There have been several attempts to cross these dried out rivers, but with poor results. The purpose of the report is to provide a solution for this problem. During the field studies, the project changed direction, and a decision was made to build a well system instead. This proved to be a better solution for the village’s water problem. The report still remained with solving the canal problem. Calculations show that a pipe placed across the dried out river would break down. The report suggests a support construction which resembles a cable stayed bridge, which is build economical and by materials accessible in the area.

    Download full text (pdf)
    FULLTEXT01
1 - 1 of 1
CiteExportLink to result list
Permanent link
Cite
Citation style
  • apa
  • apa-cv
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf