Högskolan i Skövde

his.sePublications
Change search
Refine search result
1 - 1 of 1
CiteExportLink to result list
Permanent link
Cite
Citation style
  • apa
  • apa-cv
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf
Rows per page
  • 5
  • 10
  • 20
  • 50
  • 100
  • 250
Sort
  • Standard (Relevance)
  • Author A-Ö
  • Author Ö-A
  • Title A-Ö
  • Title Ö-A
  • Publication type A-Ö
  • Publication type Ö-A
  • Issued (Oldest first)
  • Issued (Newest first)
  • Created (Oldest first)
  • Created (Newest first)
  • Last updated (Oldest first)
  • Last updated (Newest first)
  • Disputation date (earliest first)
  • Disputation date (latest first)
  • Standard (Relevance)
  • Author A-Ö
  • Author Ö-A
  • Title A-Ö
  • Title Ö-A
  • Publication type A-Ö
  • Publication type Ö-A
  • Issued (Oldest first)
  • Issued (Newest first)
  • Created (Oldest first)
  • Created (Newest first)
  • Last updated (Oldest first)
  • Last updated (Newest first)
  • Disputation date (earliest first)
  • Disputation date (latest first)
Select
The maximal number of hits you can export is 250. When you want to export more records please use the Create feeds function.
  • 1.
    Serrano Lasa, Ibon
    et al.
    Product Engineering Department, IDEKO IK4 Technological Centre, Spain.
    De Castro Vila, Rodolfo
    Business Organization, Management and Product Design Department, University of Girona, Spain.
    Goienetxea Uriarte, Ainhoa
    Research and Development Department, ULMA Handling Systems, Spain.
    Pacemaker, bottleneck and order decoupling point in lean production systems2009In: International journal of industrial engineering, ISSN 1072-4761, E-ISSN 1943-670X, Vol. 16, no 4, p. 293-304Article in journal (Refereed)
    Abstract [en]

    The purpose of this article as follows: The first is to clarify the theories underlying the definition of three concepts- Pacemaker, Bottleneck and Order Decoupling Point- in the field of production systems design, planning and control; the second is to demonstrate the existing interrelations between the three concepts; and third, to set out guidelines that will make identifying and defining these concepts easier, when attempting to design or redesign a system using a lean production approach. It is hoped that this paper will fill a gap in the literature by relating these three concepts from different points of view, as well as offer practical guidelines to academics or professionals involved in the design, or redesign, of a production system Keeping this in mind, the findings portrayed in this publication have been organized into the following sections. First the article describes the literature review process that led to acceptable theoretical descriptions for each of the three concepts. Then, from a conceptual point of view and depending on production strategy - Made-To-Order (MTO) or Made-To-Stock (MTS) -a set of considerations, in different practical situations are made establishing the relationships between each of the concepts. At the same time this document provides some procedural guidelines to help identify the three concepts. Then a practical case of production system redesign is proposed, in which aspects and methods described in this article are used. Finally, conclusions are drawn at the end. © INTERNATIONAL JOURNAL OF INDUSTRIAL ENGINEERING.

1 - 1 of 1
CiteExportLink to result list
Permanent link
Cite
Citation style
  • apa
  • apa-cv
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf