Högskolan i Skövde

his.sePublications
Change search
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • apa-cv
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf
Utvärdering och analys av batchstorlekar, produktsekvenser och omställningstider
University of Skövde, School of Engineering Science.
University of Skövde, School of Engineering Science.
2015 (Swedish)Independent thesis Basic level (degree of Bachelor), 20 credits / 30 HE creditsStudent thesisAlternative title
Evaluation and analysis of batch sizes, production sequences and setup times (English)
Abstract [en]

Volvo GTO is one of the strongest brands in the truck industry, with a long and proud history of world-leading innovations. The factory in Skövde produces diesel engines of various sizes to Volvo GTO. The project has been carried out on the processing part of grovdel crankshaft. Where the objective was to construct a simulation model that reflects flows 0, 1 and 2 on the crankshaft grovdel order to produce the best driving style for the size of the batches and sequences, focusing on PIA, between the stock and conversion-up times. A theoretical study intervention gave knowledge to the methodology to ensure that the data is collected and processed correctly. The data were collected in an Excel document, which was integrated with the simulation model for an overview and adjustments would be possible.

The simulation program, Siemens Plant Simulation 12 used in the construction of the complex model of the three flows, which where verified and validated against the real flows. Optimization on the simulation model was made with a high and a low demand for crankshafts. Several objects were taken into consideration as: minimal waiting processing Findel, minimal setup time and minimal total-PIA from a truly viable perspective. The optimization showed a possible production planning in order to best be able to run such large batches as possible with reduced readjustment time and for delays of production in processing rawflows to not occur in the refined flow. For maximum capacity in the company there are two different optimal solutions one solution focused on reducing setup time and the second solution to minimize the number of additional production hours per week.

Discrete simulation of production flows are being used to support production planning and simulation model is created for the continued use of the Volvo GTO, either in simulation group or future researches and theses in collaboration with the University of Skövde. The project objectives were achieved with good results and resulted as a standing basis for future planning of batches and sequences of processing crankshaft Volvo GTO.

Place, publisher, year, edition, pages
2015. , p. 105
Keywords [en]
Processing flows, throughput per hour, simulation model, changeovers, optimization, buffer, portal, operation, input data, buffer, cycle time, sequence
Keywords [sv]
Bearbetning flöden, takt per timme, simuleringsmodell, omställningar, optimering, buffert, portal, operation, indata, lager, cykeltid, sekvens.
National Category
Engineering and Technology
Identifiers
URN: urn:nbn:se:his:diva-11859OAI: oai:DiVA.org:his-11859DiVA, id: diva2:897829
Subject / course
Automation Engineering
Educational program
Högskoleingenjörsexamen, 180hp
Presentation
, Skövde
Supervisors
Examiners
Available from: 2016-02-03 Created: 2016-01-26 Last updated: 2016-02-03Bibliographically approved

Open Access in DiVA

fulltext(4284 kB)489 downloads
File information
File name FULLTEXT01.pdfFile size 4284 kBChecksum SHA-512
6e6f1e50837f96ee1568ab161620fc3444921bf9b35631a3340fad4d0592dbe288049886c4c32179be5b79e9888e9f95aa210581a3d9203fab3d792e7a4df19f
Type fulltextMimetype application/pdf

Search in DiVA

By author/editor
Lundberg, JesperMehtonen, Ronja
By organisation
School of Engineering Science
Engineering and Technology

Search outside of DiVA

GoogleGoogle Scholar
Total: 489 downloads
The number of downloads is the sum of all downloads of full texts. It may include eg previous versions that are now no longer available

urn-nbn

Altmetric score

urn-nbn
Total: 786 hits
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • apa-cv
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf