Högskolan i Skövde

his.sePublications
Change search
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • apa-cv
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf
Beräkning av pumpkapacitet samt konstruktion av pumpfundament
University of Skövde, School of Technology and Society.
University of Skövde, School of Technology and Society.
2013 (Swedish)Independent thesis Basic level (degree of Bachelor), 15 credits / 22,5 HE creditsStudent thesisAlternative title
Calculation of pump capacity and construction of a pump foundation (English)
Abstract [sv]

Ett undersöknings- och utvecklingsarbete för att lösa ett problem med att dränkbara pumpar i ett vattenavrinningssystem gick sönder med perioder på två år i genomsnitt, utfördes i samarbete med Cementa AB i Skövde. Orsak till pumpars haveri söktes och fanns vara bristande rutiner och kunskap om det underhåll pumparna krävde. För att lösa detta problem utvecklades riktlinjer för nyinköp av torruppställda pumpar för att möjliggöra kontinuerligt underhåll. Då möjligheter för placering av torruppställd pump saknades utvecklades ett pumpfundament för placering av torruppställd pump.

Krav för utvecklingsarbetet togs fram i samarbete med Cementas underhållsavdelning och teoretisk dimensionering av dränkbara länspumpars dåvarande volymflödeskapacitet utfördes. Krav utvärderades och viktades med hjälp av parvis jämförelse. Dimensionering och kontroll av hållfasthet för utvecklat pumpfundamentet utfördes med hjälp av Finita Element Analyser i programvaran Pro/Engineer Creo 1.0 Mechanica. Kontroll av hållfasthet i infästning av pumpfundamentet samt svetsfogar utfördes analytiskt.

Arbetet resulterade i en rekommendation till Cementa AB i Skövde att ta in offerter på nya torruppställda pumpar med hjälp av utvecklade riktlinjer och att tillverka det pumpfundament som tagits fram inom ramen för examensarbetet, för att placera nya pumpar på. Att noggrant följa de underhållsinstruktioner som pumpar har och att underlätta för personal att utföra detta underhåll ansågs kunna bidra till att pumpar skulle få en längre och mer ekonomisk livslängd. 

Abstract [en]

A development project to solve problems with why submersible pumps in a run-off system broke down with periods of two years, on average, was performed in collaboration with Cementa AB in Skövde. Reason for the pumps breakdowns was searched and found to be inadequate procedures and missing knowledge of the maintenance required on the pumps. To solve this problem, guidelines for the purchase of new dry pit pumps were developed to allow for continuous maintenance. As the possibilities of placing a dry well pump did not exist at Cementa, a pump foundation was developed.

Requirements for the development work were produced in cooperation with Cementas maintenance department and theoretical dimensioning of the submersible bilge pumps volume flow capacity was performed. Requirements were evaluated and weighted using Pairwise comparison. The design and control of the strength of the developed pump foundation was performed using finite element analysis in the software Pro/Engineer Creo 1.0 Mechanica. Controls of the strength of the attachment of the pump foundation and welds were performed analytically.

The work resulted in a recommendation to Cementa AB in Skövde to bring in quotes on the new dry-pit pumps using the developed guidelines and to manufacture the pump foundation developed within the framework of the thesis. Cementa was also recommended to carefully follow the maintenance instructions for pumps and make it easier for staff to perform this maintenance. This was recommended to ensure that new pumps would have a longer and more economical lifetime.

Place, publisher, year, edition, pages
2013. , p. 77
Keywords [en]
pump capacity, flow calculation, FEM, foundation, FMEA, volume flow rate, pairwise comparison, beam construction
Keywords [sv]
pumpkapacitet, flödesberäkning, FEM, fundament, FMEA, volymflödeskapacitet, parvis jämförelse, balkkonstruktion
National Category
Mechanical Engineering
Identifiers
URN: urn:nbn:se:his:diva-8115OAI: oai:DiVA.org:his-8115DiVA, id: diva2:623252
External cooperation
Cementa AB i Skövde
Subject / course
Mechanical Engineering
Educational program
Mechanical Engineer
Presentation
2013-03-11, G111, Högskolevägen 541 28, Skövde, 11:00 (Swedish)
Uppsok
Technology
Supervisors
Examiners
Available from: 2013-06-11 Created: 2013-05-26 Last updated: 2013-06-11Bibliographically approved

Open Access in DiVA

fulltext(23708 kB)2643 downloads
File information
File name FULLTEXT01.pdfFile size 23708 kBChecksum SHA-512
0f6f3b04a5c3278902db9447e86c09a6daa9f99d51a3931e8a43f95c77b7fb94c581b34b5f6752e295a4bb713bb9d8385d43f8c6191064f044bea66a21482c0a
Type fulltextMimetype application/pdf

Search in DiVA

By author/editor
Beijer, AntonLindholm, Magnus
By organisation
School of Technology and Society
Mechanical Engineering

Search outside of DiVA

GoogleGoogle Scholar
Total: 2644 downloads
The number of downloads is the sum of all downloads of full texts. It may include eg previous versions that are now no longer available

urn-nbn

Altmetric score

urn-nbn
Total: 1619 hits
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • apa-cv
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf