Högskolan i Skövde

his.sePublications
System disruptions
We are currently experiencing disruptions on the search portals due to high traffic. We are working to resolve the issue, you may temporarily encounter an error message.
Change search
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • apa-cv
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf
IWESS, an integrated water, energy and sanitation solution: A holistic approach to reach sustainability trough organic waste management for the Lake Victoria Basin, Kenya
University of Skövde, School of Technology and Society.
University of Skövde, School of Technology and Society.
University of Skövde, School of Technology and Society.
2008 (English)Independent thesis Basic level (degree of Bachelor), 20 credits / 30 HE creditsStudent thesis
Abstract [en]

The process of allocating necessary resources like clean water, fuel/energy and food have resulted in an unsustainable use of natural resources causing problems with Soil erosion, soil fertility, desertification, deforestation, eutrophication and global warming. The purpose of this study was to gain information on the functional design of a waste management system enabling the organic components of domestic waste to be processed as useful resources while at the same time allow them to be re-circulated. The main part of this study was carried out at the Kendu SDA Hospital in the Rachyonyo district in western Kenya. For the case of this study two main objectives where chosen. The first was to develop a principal technological solution using three classed “appropriate technologies” found suitable for the purpose namely biogas, ecological water treatment systems and slow sand filtration. The second was to further analyse each included technology to further develop their potential to fit the concept. Results from the pilot facilities where then to be retrieved from the actual component selection and construction process itself, with performance analysis left for future studies.

The main purpose of the biogas system study has been to evaluate the original ideas of overall concept, details, materials and construction methods. The 1 m3 biogas system has improved significantly during the development process and is today not far from an implementation, i.e. construction on a slightly larger scale. The biogas system developed during the project has proven to have potential for digestion of both latrine and kitchen waste. Using the two as fuel for the process does not only remove a problem – it grants several benefits.

The ecological waste water treatment system main objective was to design and construct a pilot SSF-wetland. Results show that the construction process for smaller scaled SSF systems is simple and does not require trained personnel or specialized equipment and that significant cost reduction can be made by using locally available materials.

The slow sand filtration sub system concept is called PT SCX and though still in the stage of development proved to have great potential concerning both efficiency and sustainability. The PT SCX comprises the advantages of slow sand filtration with further development of individual system solutions. It was adapted to enable both integration to the IWESS solution and stand alone installations purifying even highly turbid surface water sources to drinking water quality.

The result from the study confirms the suitability of the three included technologies, ecological waste water treatment, biogas and slow sand filtration to work in an integrated system called IWESS- Integrated Water Energy and Sanitation Solution. The combined subsystems can together with source separated sewage offer full resource recovery enabling recirculation of both nutrients and water. In addition the system can be designed as a net producer of renewable and emission free energy.

Place, publisher, year, edition, pages
Skövde: Institutionen för teknik och samhälle , 2008. , p. 104
Keywords [en]
ecological waste water treatment, slow sand filtration, deforestation, eutrophication, global warming, appropriate technologies, anaerobic process, biogas, source separation, nutrient re-circulation, waste water reuse, waste to resource, soil erosion, soil fertility, desertification
National Category
Other Environmental Engineering
Identifiers
URN: urn:nbn:se:his:diva-566OAI: oai:DiVA.org:his-566DiVA, id: diva2:2951
Presentation
(English)
Uppsok
Technology
Supervisors
Examiners
Available from: 2008-01-23 Created: 2008-01-23 Last updated: 2009-11-30

Open Access in DiVA

fulltext(3735 kB)3357 downloads
File information
File name FULLTEXT01.pdfFile size 3735 kBChecksum MD5
c4689bc9f6d3477f23dce537660a85f9a7474f674acac1e2a0cc8213d30863a77cea77a1
Type fulltextMimetype application/pdf

By organisation
School of Technology and Society
Other Environmental Engineering

Search outside of DiVA

GoogleGoogle Scholar
Total: 3359 downloads
The number of downloads is the sum of all downloads of full texts. It may include eg previous versions that are now no longer available

urn-nbn

Altmetric score

urn-nbn
Total: 1728 hits
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • apa-cv
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf