This study is motivated by a real case study and addresses the material supply problem at assembly lines. The aim of the study is to optimally schedule the delivery of raw material at assembly lines while using the minimum number of vehicles. To cope with the problem an original mixed integer linear programming model has been proposed based on the assumptions and constraints observed in the case study. The validity of the model has been examined by solving several real cases and analysing different scenarios. The results of the study show the efficiency and effectiveness of the model.
CC BY-NC-ND 4.0
Edited by Lihui Wang