Högskolan i Skövde

his.sePublikationer
Driftstörningar
Just nu har vi driftstörningar på sök-portalerna på grund av hög belastning. Vi arbetar på att lösa problemet, ni kan tillfälligt mötas av ett felmeddelande.
Ändra sökning
RefereraExporteraLänk till posten
Permanent länk

Direktlänk
Referera
Referensformat
  • apa
  • apa-cv
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Annat format
Fler format
Språk
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Annat språk
Fler språk
Utmatningsformat
  • html
  • text
  • asciidoc
  • rtf
Non-identical parallel machines batch processing problem with release dates, due dates and variable maintenance activity to minimize total tardiness
Department of Business Development, Sepid Makian Company, Rasht, Guilan, Iran ; Department of Industrial Engineering, Payame Noor University, Tehran, Iran.ORCID-id: 0000-0003-2300-7929
Vista Samaneh Asa Company, Tehran, Iran ; Department of Computer Engineering, Islamic Azad University, Rasht, Guilan, Iran.
VRAIN - Valencian Research Institute for Artificial Intelligence, Universitat Politècnica de València, Valencia, Spain.
School of Management, Curtin Business School, Bentley, WA, Australia.
2022 (Engelska)Ingår i: Computers & industrial engineering, ISSN 0360-8352, E-ISSN 1879-0550, Vol. 168, artikel-id 108135Artikel i tidskrift (Refereegranskat) Published
Abstract [en]

Combination of job scheduling and maintenance activity has been widely investigated in the literature. We consider a non-identical parallel machines batch processing (BP) problem with release dates, due dates and variable maintenance activity to minimize total tardiness. An original mixed integer linear programming (MILP) model is formulated to provide an optimal solution. As the problem under investigation is known to be strongly NP-hard, two meta-heuristic approaches based on Simulated Annealing (SA) and Variable Neighborhood Search (VNS) are developed. A constructive heuristic method (H) is proposed to generate initial feasible solutions for the SA and VNS. In order to evaluate the results of the proposed solution approaches, a set of instances were randomly generated. Moreover, we compare the performance of our proposed approaches against four meta-heuristic algorithms adopted from the literature. The obtained results indicate that the proposed solution methods have a competitive behaviour and they outperform the other meta-heuristics in most instances. Although in all cases, H + SA is the most performing algorithm compared to the others.

Ort, förlag, år, upplaga, sidor
Elsevier, 2022. Vol. 168, artikel-id 108135
Nyckelord [en]
Minimization of total tardiness, Parallel machines, Batch processing machines, Scheduling with maintenance activity
Nationell ämneskategori
Tillförlitlighets- och kvalitetsteknik
Identifikatorer
URN: urn:nbn:se:his:diva-23594DOI: 10.1016/j.cie.2022.108135ISI: 000805819000007Scopus ID: 2-s2.0-85127478370OAI: oai:DiVA.org:his-23594DiVA, id: diva2:1837918
Tillgänglig från: 2024-02-15 Skapad: 2024-02-15 Senast uppdaterad: 2024-02-15Bibliografiskt granskad

Open Access i DiVA

Fulltext saknas i DiVA

Övriga länkar

Förlagets fulltextScopus

Person

Beldar, Pedram

Sök vidare i DiVA

Av författaren/redaktören
Beldar, Pedram
I samma tidskrift
Computers & industrial engineering
Tillförlitlighets- och kvalitetsteknik

Sök vidare utanför DiVA

GoogleGoogle Scholar

doi
urn-nbn

Altmetricpoäng

doi
urn-nbn
Totalt: 52 träffar
RefereraExporteraLänk till posten
Permanent länk

Direktlänk
Referera
Referensformat
  • apa
  • apa-cv
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Annat format
Fler format
Språk
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Annat språk
Fler språk
Utmatningsformat
  • html
  • text
  • asciidoc
  • rtf