Högskolan i Skövde

his.sePublikasjoner
Endre søk
RefereraExporteraLink to record
Permanent link

Direct link
Referera
Referensformat
  • apa
  • apa-cv
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Annet format
Fler format
Språk
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Annet språk
Fler språk
Utmatningsformat
  • html
  • text
  • asciidoc
  • rtf
Kapacitetsanalys av produktionsflöde: - Med hjälp av produktionssimulering och traditionella produktionstekniska verktyg
Högskolan i Skövde, Institutionen för ingenjörsvetenskap.
2014 (svensk)Independent thesis Basic level (degree of Bachelor), 20 poäng / 30 hpOppgaveAlternativ tittel
Analysis of capacity in a production flow : - Utilizing simulation and method engineering tools (svensk)
Abstract [sv]

Volvo GTO i Skövde tillhör tillverkningsindustrin och levererar motorer till lastvagnskunder över hela världen. Alla motorer som sänds på export går genom ett produktionsflöde, CBU-line. CBU-line är en monteringslina som sedan konstruktion 1996 inte genomgått någon större layoutmässig förändring, trots att uppgiften för flödet förändrats. Syftet med projektet är att genom analys ta fram förutsättningar för att kunna bedöma flödets kapacitet samt att ta fram fokusområde för kommande förbättringsinsatser.

Flödet saknar i stor utsträckning det produktionstekniska data som behövs för att bedöma dess kapacitet. Baserat på detta har ett antal olika metoder används för att tillsammans skapa en bild över flödets nuläge. Metoder såsom tidsstudie, frekvensstudie och AviX-studie har genomförts för att identifiera flaskhalsarna i flödet. Det tydliggör också hur mycket arbete som kategoriseras som värdeadderande, i hela flödet och per station. Utöver dessa traditionella produktionstekniska verktyg har det genomförts en produktionssimulering. Genomförda analyser visar genomgående på en gemensam flaskhals i produktionsflödet som därmed blir fokus för förbättringsarbete.

Genom simuleringsanalys har flödets tekniska kapacitet uppskattats till cirka 40 % högre genomströmning än som sker i flödet idag. En simuleringsanalys baserad på ett framtaget förbättringsförslag visar även på en potentiell ökning med 32 %. För att skapa förutsättningar att uppnå detta krävs systematiskt arbete med att balansera upp flödet samt att reducera påverkan från störningar och slöseri som utgörs av över 70 % av all aktivitet i flödet. Arbetet har tagit fram förslag på att med relativt enkla medel kunna reducera flaskhalsen och öka genomströmningen genom flödet.

Abstract [en]

Volvo GTO in Skövde belongs to manufacturing and supply engines for truck customers worldwide. All engines to be sent for export goes through a production flow, CBU-line. CBU-line is an assembly line that not since construction in 1996 has undergone any major layout changes of substance, although the details of the flow changed. The object of the project is that by analyzing access conditions in order to determine the flow capacity and to produce focus areas for future improvement efforts.

The flow lacks a large amount of the production engineering data necessary to assess its capabilities. Based on this a number of methods have been used together to create a picture of the current state of flow. Methods such as time study, work-study and AviX study have been conducted to identify bottlenecks in flow. While it is clear how much work is categorized in value-added in whole flow and per station. In addition to these traditional production engineering tools, there have been a production simulation. Implemented analyzes consistently shows a common bottleneck in the production flow which becomes the focus of improvement efforts.

Through simulation analysis, the flow technical capacity estimated to be approximately 40 % higher than the throughput that occurs in the flow today. Simulation Analysis based on one developed suggestion for improvement indicates a potential increase of 32 %. To create the conditions to achieve this requires systematic efforts to reduce the effect of interference and wastage in the flow comprising over 70 % of all activity in the flow. The work has proposed that with relatively simple means to reduce bottleneck and increase throughput through the flow.

sted, utgiver, år, opplag, sider
2014. , s. 89
Emneord [sv]
Flöde, Frekvensstudie, Metodstudie, Simulering, LEAN
HSV kategori
Identifikatorer
URN: urn:nbn:se:his:diva-10019OAI: oai:DiVA.org:his-10019DiVA, id: diva2:750283
Fag / kurs
Automation Engineering
Utdanningsprogram
Industrial Automation Engineer
Presentation
2014-06-04, Högskolan i Skövde, Högskolevägen Box 408, 541 28, Skövde, 09:00 (svensk)
Veileder
Examiner
Tilgjengelig fra: 2014-10-07 Laget: 2014-09-28 Sist oppdatert: 2014-10-07bibliografisk kontrollert

Open Access i DiVA

Kapacitetsanalys av produktionsflöde(3925 kB)1991 nedlastinger
Filinformasjon
Fil FULLTEXT01.pdfFilstørrelse 3925 kBChecksum SHA-512
d66584de756b4250e818bbf0bdb13c1f3c45e7aed7cf0d6a80e80c21c86828d255fe9445c3370285208bac559ed2472b44a3b5a49949b24172b8b26819d52513
Type fulltextMimetype application/pdf

Av organisasjonen

Søk utenfor DiVA

GoogleGoogle Scholar
Totalt: 1991 nedlastinger
Antall nedlastinger er summen av alle nedlastinger av alle fulltekster. Det kan for eksempel være tidligere versjoner som er ikke lenger tilgjengelige

urn-nbn

Altmetric

urn-nbn
Totalt: 3298 treff
RefereraExporteraLink to record
Permanent link

Direct link
Referera
Referensformat
  • apa
  • apa-cv
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Annet format
Fler format
Språk
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Annet språk
Fler språk
Utmatningsformat
  • html
  • text
  • asciidoc
  • rtf